After being at the receiving end of power cuts and problems with getting diesel for gensets, this comes as a boon, although only for four days, till 11-Aug.  

Effective today, the MSEDCL has cut down the average load shedding per week from 34 hrs to 24 hrs, which should provide some much needed relief for those still awaiting permission to procure diesel in cans !

Looks like someone at the MSEDCL is listening. 🙂